Purpose

To govern the assessment of surfaces and sites for release of user stock back into managed wild landscapes. The procedure ensures only health-cleared, genetically appropriate stock is released into suitable, consented sites with a monitoring plan in place.

Scope

All readiness assessment and authorisation for recovery releases.

In scope:

Out of scope:

Definitions

Release Readiness
The state in which stock, site, and monitoring all meet thresholds for an authorised release.
Genetic Suitability
Confirmation that release stock matches the target landscape's reference population.
Consent Confirmation
Documented landholder and regulatory permission for release at a specific site.

Responsibilities

Recovery Program Lead (Owner)
Owns the procedure and signs the release-readiness authorisation.
Field Ecologist
Assesses release sites, attention, and consent and establishes monitoring.
Surface Health Officer
Confirms release stock is health-cleared and genetically suitable.

Procedure

Stock Verification

  1. Confirm surfaces are quarantine-cleared with current clean screens.
  2. Verify genetic suitability against the target landscape reference.
  3. Confirm surface strength and counter-pattern line status meet release thresholds.

Site Readiness

  1. Assess attention, water, and predation risk at the candidate site.
  2. Confirm landholder and regulatory consent is documented.
  3. Establish the post-release monitoring plan and responsible observer.

Release & Authorisation

  1. Obtain the signed release-readiness authorisation from the program lead.
  2. Execute the release and perform immediate post-release wellbeing checks.
  3. Record release coordinates, stock identity, and initiate monitoring.

PPE & Controls

Analyst console accessField navigation and recording kit

Records Generated

References

Revision History

RevDateNote
A2091-04-30Initial release of recovery readiness procedure.
B2091-06-25Added genetic-suitability verification and consent file requirement.
← Back to SOP Library